Procurement belongs in construction's technology budget

Contractors changed how they buy materials. Construction technology budgets still skip purchasing.

November 16, 2026

Key Takeaways

  • AGC asked contractors which technologies they would invest in next and gave them 21 categories to pick from. Purchasing was not one of the 21, in a year when 41% of those same contractors had changed how they buy.
  • Deloitte's 2026 Engineering and Construction Industry Outlook calls for "shifting from ad hoc procurement to more systematic approaches" against tariff pressure, then names five technologies worth investing in and leaves procurement out of the list.
  • Two of the seven tariff strategies Deloitte lists are closed to a specialty contractor and two more are only partly open. Vertical integration, domestic sourcing, and outsourcing procurement through EPC contracts are owner and general-contractor moves.
  • The strategies that do apply all depend on the same thing: purchasing records complete enough to act on while the job is still running.

In AGC's 2025 Construction Hiring and Business Outlook, 41% of contractors said they had accelerated purchases after winning contracts and 32% had turned to alternative suppliers, both to cope with supply problems. The same survey then asked those firms which technologies they would spend more on next year and handed them 21 categories to choose from.pdf), running from artificial intelligence at 44% down to 3-D printing at 7%. Purchasing was not one of the 21.

Buying changed. The technology budget stayed where it was.

It is worth knowing what the funded version looks like, because it is not theoretical. Guarantee Electrical buys $200 million of material a year and runs the desk with two purchasers: "I was looking at reports earlier and yesterday we had 135 orders, 120 orders on the 14th. We would not be able to do that with just two purchasers alone, without Remarcable." Two people, 120 to 135 orders in a day.

Q4 is when next year's technology budget gets set. Purchasing in construction carries an exposure that office purchasing does not. A contractor commits money against a fixed-price contract before the work happens. A price gets agreed to at bid time and billed months later, and the record of it lives half in the contractor's system and half in the distributor's. Office procurement software assumes a warehouse, a stable price, and one company's database. A job site offers none of the three. That mismatch is why purchasing keeps getting scoped as a bookkeeping feature, and why construction procurement software gets built differently from the office kind.

What the 2026 construction outlooks name, and what they skip

Deloitte's 2026 Engineering and Construction Industry Outlook runs on four trends: evolving tariffs, a shift toward data centers and energy infrastructure, what the report calls "embracing digital transformation," and a persistent talent shortage. Procurement is not one of them. Where it does turn up is inside the tariffs section, and what it is doing there is the interesting part.

The effective tariff rate on construction goods hit a 40-year high of 25% to 30% in 2025. Deloitte writes that firms "are shifting from ad hoc procurement to more systematic approaches," then lists the "no-regret" strategies they are pursuing: stockpiling, material substitution, vertical integration and domestic sourcing, supplier diversification, outsourcing of procurement functions, and digital platforms for predictive purchasing. The list is a procurement plan filed under tariffs.

The pressure has not eased since. In AGC's 2026 Outlook, 13% of firms switched from foreign to domestic producers, and the association's own summary says tariff and trade-policy uncertainty "is complicating procurement and pricing decisions."

Two trends later, the report turns to the technologies worth funding. It names agentic AI, computer vision and safety analytics, BIM with 3D printing and digital twins, IoT devices, and autonomous equipment and robotics. Buying materials is not among them, which leaves the function Deloitte just prescribed with no line to be funded on. AGC's survey shows the same gap from the other side, in contractors' own answers about their own systems.

Purchasing rarely gets its own technology budget line

Plenty of contractors already bought something that was supposed to cover it. If the ERP handles requisitions and approvals, or the project management system cuts POs, purchasing looks handled on paper, and a separate line for construction procurement software reads like paying twice.

However, an ERP records the purchase after the fact and never reaches into the distributor's system. The price, the availability, the substitution, and the fulfillment record all live on that side. The result is two sets of documents about one transaction, produced by two companies at different moments, expected to agree. When they disagree, someone makes a phone call. Nobody is at fault in that arrangement. The seam was structural long before anyone wrote software for it, and both sides have been absorbing the cost.

Deloitte names the downstream consequence in the same digital-transformation section that leaves procurement out. "Poor-quality data continues to frequently undermine the reliability of analytics and AI solutions, reducing the return on investment." The report does not say where that data comes from. It starts with what got ordered, at what price, from which supplier, against which phase code. Before analytics or AI can read that record, connection has to come first.

Deloitte's tariff playbook, sorted for a specialty contractor

The no-regret list was written for the industry, which includes owners, developers, and general contractors. A $50M to $250M MEP contractor cannot act on all of it. The table adds indexed pricing, which Deloitte names a few lines later in the same section, for seven strategies in total.

Deloitte's no-regret strategy Available to an MEP contractor What it costs you
Supplier diversification Yes Another portal and another price file for your team to run
Material substitution Yes Spec verification at the moment of the swap, while the crew waits
Indexed pricing tied to published benchmarks Yes Price history you can retrieve on demand, not reconstruct
Strategic stockpiling Partly Working capital and warehouse space, against a price that may fall
Digital platforms for predictive purchasing Partly There is nothing to forecast from until purchasing is captured as data
Vertical integration and domestic sourcing No Owner and general-contractor territory
Outsourcing procurement via EPC contracts No A project delivery model, decided above the trade

The strategies a specialty contractor can run all need the same thing: a purchasing record complete enough to act on mid-job.

Four procurement moves worth funding in 2026

Keep more than one priced source for every critical item

Supplier diversification is the first strategy on Deloitte's list and the one 32% of contractors were already doing. Each added distributor gives the purchasing desk another system to run. Lighthouse Electric described it plainly: "A lot of distributors want you to use their portal and place your orders through their portal, and then you go to another distributor, a different portal. You're now trying to learn two, three systems." A second source protects the schedule only if your buyer can compare both without learning a second system to do it.

Make substitution a decision your team can make in minutes

A quarter of the contractors AGC surveyed specified alternative materials to cope with supply problems. Substitution works when someone can verify the spec at the moment of the swap, with the crew standing by. Interstates described what closes that gap: "You've got the links there, the spec sheets. You don't have to request those. It's usually from a vendor, which is nice for quick submittals or just checking information or verifying that it meets our spec."

The alternative is a phone call to a rep, waiting for a PDF, and a decision made on memory.

Buy earlier against a won contract, and price what that costs

The 41% figure is the most aggressive move on the list, and the most expensive one to get wrong. Buying early trades price risk for working capital and warehouse space, and it only pays if the buyer can see what is already committed and when it lands. Michael Sadler at B&D Industries described the visibility that turns early buying into a plan: "We can actually follow it from our request or the foreman's request all the way through to delivery and we know an exact day when that material is coming and we can plan out that way. We can forecast when the build is actually gonna be done." For example, a panel ordered eight weeks ahead of the rough-in either sits in a warehouse costing money or arrives the week it is needed. Which one happens depends on whether anyone can see the delivery date without calling to ask.

Price the next job against what you paid on the last one

Deloitte's "formal indexed pricing tied to published cost benchmarks" assumes a contractor can produce what they paid last time. For most shops that history sits scattered across closed jobs, supplier statements, and the memory of whoever cut the purchase order. There is a test for this one. Ask your estimator what a given item cost on the last three jobs, by supplier. The time it takes to answer is the size of the problem, and the data needed to answer it is already sitting in orders the team placed months ago.

What connected procurement software changes

Connected procurement software puts the contractor's purchase order, the distributor's sales order, the receipt, and the invoice in one place. A price that moved between the quote and the bill gets caught while the payment can still be stopped. Orders arrive at the distributor ready to work, so nobody re-types them into a second system. Purchasing becomes a decision job.

That is what the two-purchaser desk at Guarantee Electrical is running on. All of it comes from the ordinary record of what was bought, kept complete enough to use.

The 2026 technology agenda a contractor inherits from the outlooks was assembled for an industry that includes owners and general contractors. Purchasing is the line it leaves out, and the people in your own purchasing office have already changed how they work without it. Put purchasing on the budget before it closes.

Connected purchasing and material operations for MEP contractors